Slow Karl

From Gowanus Lounge (welcome back, Bob), the slowest Karl Fischer building in the neighborhood (at North 8th and Roebling).
I still say the slowest project in the neighborhood is 80 Metropolitan. Karl moving backwards would still be faster than 80 Metropolitan. This is a project that has worked six days a week for two years, and is still is not closed up (the first windows were installed two weeks ago).