New Park with Decoyotes

Nice article and photos on the newly-opened 50 Kent parcel at Bushwick Inlet Park. Include the anti-geese coyotes. I’m not sure how the geese know the difference between coyotes and dogs, but whatever. (Also, really hoping that the actual dogs – and their owners – don’t ruin this space.)

For those of you keeping score at home, the new piece of the park is just under 2 acres, and represents about 7% of the future full park buildout (27 acres). To date, just under one-third of park that was promised in 2005 is completed and open to the public. That works out to about half an acre of park per year.

Thoughts on River Ring

River Ring – the proposed rezoning by Two Trees of the former Con Ed site at Metropolitan and River Street – kicks off its ULURP review with a Community Board 1 Land Use committee meeting on Wednesday. Hopefully the CB recommends for changes but does not follow the lead of those who want to kill the project outright. This is a chance to rezone one of the last waterfront parcels on the East River, locking in a significant open space connector, affordable housing and more.

First off, this site should be residential. Period.

River Ring master plan

River Ring Master Plan
via FieldOps

There is no valid public policy reason to leave this zoned for heavy manufacturing. It should be smaller (floor area), which will make it shorter (not a big deal for me, but everyone else keys on the height). The open space is visionary and should be a model for future waterfront development – every developer should be held to this standard. It has everything community activists have been clamoring for and will connect the Southside waterfront and the rest of the neighborhood. There should be more affordable housing and it should be more affordable. 30% to 35% of the units, at a project-wide average AMI of 40%.

Hopefully CB1 supports the residential zoning *with* conditions. As they did for the 2010 Domino Rezoning (pre-Two Trees). In 2010 the CB did not say that residential use was inappropriate at Domino – rather that developer was trying to supersize the density. They should say the same thing here – support residential use, affordable housing and open space, but see it done better. (This would also be consistent with CB1’s District Needs statement, which lists affordable housing as the top TWO (of three) key issues for the community. It would also be in line with CB1 recommendations on other waterfront projects – Kedem Winery (420 Kent), Certified Lumber (Rose Plaza) and Shaefer Landing. Saying that this one parcel should be kept as M3 zoning doesn’t make sense in light of all these prior recommendations.)

There really is no valid public policy reason to leave the former Con Ed property zoned for M3 (heavy manufacturing). What kind of residential and how much can be debated, but if you are arguing to leave this as manufacturing you are not engaging in an honest debate. (The only other valid use I could see here is a public park. That would cost upwards of $300M for acquisition and construction – given the City’s track record at Bushwick Inlet, I’m not holding my breath. Not to mention that Parks would never build a build a waterfront park to the level of quality and design that Two Trees is proposing.)

This site should have been rezoned for residential years ago. In 2005 Domino was still in operation and it made sense to leave the area from Bway to N3 as manufacturing. But Domino closed shop just as that rezoning was going through, making the M zoning has been an anachronism. 11 years ago, when the first Domino Rezoning came through CB1, I asked why the City wasn’t developing a plan for the whole area – I still think that they should have. But instead, these parcels have been rezoned piecemeal – zoning, not planning, once again is the norm in NYC.

How much residential? I do think that the density being proposed is too much. Not a lot too much, but a bit too much. Back of the envelope, maybe 10% too much – the zoning should be straight R8, 6.5 FAR with the inclusionary bonus, same as the rest of the waterfront towers. (Yes, the waterfront sites from the 2005 Greenpoint-Williamsburg waterfront rezoning have a blended R6/R8 zoning, but on zoning lots that are 2 to 3 times the size of River St. and go all the way out to Kent/West. Blended zoning here would kill the affordable cross subsidy.)

Two Trees is also seeking a zoning waiver to reduce parking below what is required by zoning. Grant it. More parking means more cars, there is solid documentation for this. And more parking also means less affordable housing, there is solid documentation for that too.

In terms of the overall proposal, I love the waterfront access and open space. Field Ops design is truly transformative and is pretty much everything that open space advocates in the community have been asking for for years. It is resilient, both diurnally and annually. It is the first truly resilient open space on 4 miles of waterfront. It brings the public to the water without bulkheads, wharves or “get-downs”. It avoids the use of rip-rap and other unfriendly barriers between people and the water. The design reuses the pod wharves from the Con Ed site in creative ways to deal with the tides and currents of the East River. Most importantly, it CONNECTS the waterfront – the Northside esplanades to Grand Ferry Park, something that I and others have been advocating for years now. And it does so in a way that is a thousand times better than the waterfront esplanades of the 2005 rezoning. (Like at Domino, Two Trees promises to maintain the park rather than turning it over to Parks Department to manage – that is a very good thing too.)

(Also worth noting here for the proponents of leaving the M3 zoning intact – there is no requirement to provide waterfront access under the existing zoning – this property falls outside the Waterfront Access Plan, which requires public access to the waterfront. If an as-of-right development were to provide any waterfront access (and they don’t have to), it could be 100% private. No public access, not even an esplanade.)

As for the architecture, OK, meh. For me, BIG’s whole schtick is about, well, big ideas with no nuance. The massing here is fine – yeah, the towers are ginormous, but any reduction in FAR will quickly knock off a lot of those small floor plates. Cut back the FAR 10% and I bet the height drops by 25% or more. I‘ve never been an opponent of height on its own. Everything on the waterfront is out of context with the neighborhood, but the overall urban design here is so much better than the 2005 paradigm.

The buildings from the 2005 rezoning – 40 stories with large floor plates on blocks that 400’ deep to the river set in semi-private compounds – are more offensive in terms of urban design than what is proposed here. Take a walk down South 1st from Kent and compare that to a walk down North 5th from Kent. The Battery Park City model on which the 2005 rezoning was based is just not good urban design, especially on very deep blocks, and 1 South 1st is great proof that taller buildings on smaller floorplates are more pedestrian friendly.

On affordable housing, there should be more. 30% to 35% at an overall average 40% AMI. Maybe this is unrealistic with existing subsidies & inclusionary housing, but if the city, state and feds aren’t going to build affordable housing they should at least pay others to do so. (Keeping this site zoned M3 means no affordable housing at all. 200+ units won’t be built under an M3 (or M-anything) scenario.)

And please, change the name.

City Moves Ahead on Two Williamsburg Park Projects

The City has started construction on 50 Kent, part of the Bushwick Inlet Park puzzle, as well as on the second phase of work at La Guardia Playground, located on South 4th Street next to the BQE on ramp.

When completed a year from now, 50 Kent will be the first new parkland created at Bushwick Inlet Park in almost a decade. The $7 million in funding for this 2-acre piece of the park was allocated in 2017, along with funding for the Motiva site at BIP.

Together, these two parcels will add about 3 acres to the existing 6 acres. The big question, though, is when the remaining 2/3 of the park will be finished. To date, no money has been allocated for demolition of the CitiStorage building, nor for remediation and construction on the remaining 16 acres.

Public-Private Brooklyn Waterfront Project Is Starting To Bloom

WSJ [subscription required] looks at the Williamsburg and Greenpoint waterfront esplanade, a feature of the 2005 rezoning that provides public access to the waterfront. So far, the Williamsburg portion – all four blocks of it – is complete, and the first one-block section in Greenpoint is set to come online in the coming months with the completion of the Greenpoint condominium between India and Huron Streets.

The Greenpoint section of the esplanade – eventually a mile of riverfront access – will be in fits and starts as development comes online over the next decade (or two?). And some day, this will all connect into the various parks along the waterfront, including Bushwick Inlet Park, Transmitter Park and East River State Park (the privately-owned Monitor Museum also fits into this). But there are holes too – the esplanade currently ends at North 3rd Street (184 Kent), picks up again at Grand Ferry Park and (soon) connects to Domino Park, and then breaks again until Kedem Winery, Shaefer Landing and (someday, perhaps) Certified Lumber.

The two big holes preventing a continuous waterfront experience from Wallabout Creek to Newtown Creek? The city-owned Williamsburg Bridge Park site at Broadway, and Con Ed’s North 3rd Street property.

All Parking

A lot of people have been speculating as to what an “as-of-right” development at the CitiStorage property might look like. The property – promised as a park in 2005, but still in private hands – is zoned for M3 (heavy industrial). The likelihood of a rezoning to residential use or to a lesser degree of M zoning is pretty close to nil, at least for the foreseeable future. Councilman Steve Levin has said that he would never support such an action, and all of the other elected officials – Congresswoman, Borough President, Assemblyman and State Senator – have all gone on record as opposed to any actions that are not for a park. The Mayor has said that his administration would not approve a rezoning over community opposition.

That explains why the owner’s recent marketing package for the property describes it as “as-is, where-is“. Anyone buying this property is buying M3 land. Still, it is M3 land on the Williamsburg waterfront, and M3 can include office and retail use (but not hotel use – that is only allowed in M1). So an as-of-right development could include some mix of office and retail uses, for which there is certainly a market in Williamsburg and Greenpoint.

It turns out, though, that it may not be that easy. M3 zoning comes with some pretty hefty parking requirements. On top which, the property is subject to additional restrictions as a waterfront site and as part of the Williamsburg/Greenpoint Waterfront Access Plan (WAP) established as part of the 2005 rezoning.

All of this boils down to this – any substantial “as of right” development of the property for commercial use would need contain an almost equally substantial parking structure.

The math works out like this – according to Cushman & Wakefield’s set up for the property, there are about 588,000 square feet of development rights. For Use Group 6 (commercial retail and office use) M3 zoning requires 1 parking space for every 300 square feet of development. That means 1,920 parking spaces would be required for a full build out. A standard parking space is 300 square feet, which means that the required parking would amount to 588,000 square feet. Parking (within limits, see below) does not count as floor area, so the total envelope of the as-of-right development at full build out would be just under 1.2 million square feet.

That parking cannot go anywhere.

It can go underground, but this property is in a flood zone and has a water table about 4′ to 5′ below grade. Underground parking is very expensive, but underground parking below the water table is doubly so.

The parking could go in an above-grade parking structure. Under the WAP, any parking under 33′ in height would not count as floor area. A parking structure 33′ high would allow three stories of parking, so the parking could be consolidated on about 1/3 of the site.

But there are more restrictions. The WAP requires that all parking be wrapped by commercial or residential uses to a depth of at least 25′. So the footprint available for parking would be a smaller area at the center of the lot. And by putting parking there, you can’t use that area for ground-floor retail use. So the mix of office to retail shifts strongly in favor of office, with only smaller ground-floor retail footprints.

M3 zoning also has height limits. Street walls are limited to 60′ (six stories), and overall height is limited to 110′ (11 stories). A penthouse rule under the WAP can raise that height limit to 150′ (15 stories) in areas. But if a big chunk of your building base is occupied by a 3-story-tall parking structure, the envelope available for retail and office use starts to shrink considerably.

Add to this the setback requirements of the waterfront zoning regulations and the open space requirements of the WAP (15% of the site needs to be waterfront open space), and things get tighter.

Not to mention more expensive. Even above grade, structured parking is expensive. And there isn’t enough room at grade to just build a parking lot (talk about paving paradise…).

This is one of the issues that led the developers of 25 Kent Avenue to pursue a rezoning to allow office and commercial construction at its M1-zoned property without the hefty parking requirements. City Planning recently approved that rezoning, but it was contentious, and in the process, the abandoned a broader rezoning for the area. That rezoning would not have extended to the Bushwick Inlet properties across Kent Avenue.

There is some relief available. With permission from DOB, you can reduce the area per parking space to about 225 square feet, or about 441,000 square feet. But that requires fully-attended parking – a more expensive proposition. There is also a variance available through the Board of Standards and Appeals, which could cut the number of parking spaces in half. But that is a discretionary process, and just about every level of city government has gone on record stating that they would not support any discretionary actions for this property. As is means as is.

The upshot is this – as-of-right development at the CitiStorage site comes with very restrictive open space, building envelope and, in particular, parking requirements. Those parking requirements would add significantly to the cost of development on the property, and any knowledgable buyer looking at this property must be taking this – and the downright toxic political environment (and actual environment) surrounding this site – into account in pricing their offers.

Cleaning Up Bushwick Inlet Park

1904 Key Map

1904 Belcher Hyde map (composite) showing current parcels on East River waterfront. (Map shows incorrect configuration
of Bushwick Inlet itself.) [NYPL]


Newtown Pentacle always has interesting posts, and interesting asides. Wednesday’s nail biting has some of both – well-researched before and after images of Newtown Creek, 1881 vs. today, and brief mention of something that I have been spending a lot of time looking at over the past few months in relation to the environmental legacy at Bushwick Inlet Park (BIP) – manufactured gas. In studying the potential environmental clean ups required for the future parcels of BIP, it turns out (not surprisingly) that these issues are deeply intertwined with the long-past industrial history of the sites. What is one day to become a 27-acre park, for close to two centuries, has been the site of intensive industrial activity. With all the recent talk of the pending sale of a portion of the promised parkland, either to the City of New York or to a private developer, the subject is especially timely.

For the better part of a century, the three and a half northern blocks of the future BIP, from North 10th Street to Bushwick Inlet itself, had two primary industrial uses – manufacture of coal-tar gas and petroleum distillation and processing. The block between North 11th and North 12th Streets – half of which is owned by the City and the other half owned by CitiStorage – was the site of a manufactured gas plant from the 1850s through the 1940s. Throughout roughly the same time period, the blocks to the north and the south – the northern ones owned by the City, the southern one owned by CitiStorage – were home to Standard Oil’s Pratt Works, a massive petroleum distilling, storage and distribution operation. These blocks are in the middle of what will (hopefully) soon be Bushwick Inlet Park. But before it can become a park, there is a lot of environmental remediation that will need to happen. Some of that remediation is underway, some of it about to happen, and some awaiting acquisition of the final pieces of property.

Bushwick Inlet Park was mapped as part of the 2005 Greenpoint-Williamsburg Waterfront Rezoning. The rezoning transformed close to 200 blocks in Greenpoint and Williamsburg from manufacturing zoning to residential zoning, kickstarting the north Brooklyn real estate boom. When completed, the Williamsburg and Greenpoint waterfront will be home to a couple dozen towers fronting on a shore public walkway connecting Newtown Creek to Northside Piers and the Austin Nichols building. In the middle of that shore public walkway will be Bushwick Inlet Park, a 27-acre regional park that was mandated as by the 2005 environmental impact statement (EIS) as mitigation for the adverse impact of all this new development on north Brooklyn’s already paltry open space. The park site consists of multiple properties, most of which have been acquired by the City. The only hold out at this point is the 7-acre CitiStorage site, which occupies a block and a half between North 10th and North 12th Streets.

The properties that were mapped by the City in 2005 as Bushwick Inlet Park, along with a brief overview of the environmental legacies at each, working from north to south, are as follows:

Monitor Museum – the northernmost site, this one-acre parcel sits on the northern side of Bushwick Inlet. It was formerly owned by Motiva Enterprises, a former subsidiary of Texaco that manufactured and marketed petroleum products. The property is across Quay Street from the Continental Iron Work, where the Civil War ironclad USS Monitor was built. This parcel was donated by Motiva to the Greenpoint Monitor Museum in 2004, and is slated to be developed as a permanent museum to USS Monitor. (The Monitor Museum property is not part of the NYC Parks development of Bushwick Inlet Park, but when completed it will be an important part of the waterfront experience connecting Greenpoint and Williamsburg.) Historically, this side of Bushwick Inlet was used for lumber storage and spar (mast) storage. Based on the history of use at the site, the Monitor site would appear to be relatively clean for a north Brooklyn waterfront site.

Motiva site – adjacent to the Monitor site, this parcel wraps three sides of Bushwick Inlet. At some places, the parcel is only about 10′ deep. The property was acquired under the de Blasio administration in 2014. The southern part of the Motiva property abuts the Bayside site (below), a property that has a large potential environmental legacy to be addressed, while the northern part of the site appears to be similar in condition to the Monitor Museum site.

BirdsEye lores

Bird’s eye view of Pratt’s Astral Oil Works in 1872. The retorts of the Williams-
burgh Gas Light Co. can be seen at the far right.
[Novelty Theater]

Bayside site – This is where things start to get messy. The Bayside site is the northernmost park property in Williamsburg, sitting between North 12th Street and Bushwick Inlet. The property was the original home of Charles Pratt & Co.’s Astral Oil Works, dating back to the 1860s. The Pratt works initially refined kerosene, and was the source of Charles Pratt’s wealth and philanthropy, which included Pratt Institute and the Astral Apartments in Greenpoint, among other endeavors. In 1874, Charles Pratt & Co. and Astral Oil became part of John D. Rockefeller’s nascent Standard Oil Co., and in the process Charles Pratt and his partner Henry Rogers became two of America’s wealthiest men. The Pratt Works at North 12th Street became part of Standard Oil’s empire, and operated as an oil refining and storage site under Standard Oil through the 1940s, and subsequently under other operators, most recently Bayside Fuel. The continuous petroleum storage operations ended this past Spring, when the City completed an acquisition of the property started under the Bloomberg administration.

Gasoline still lores

Gasoline Still, Pratt’s Astral Oil Works (1872)
[Novelty Theater]

Now that the Bayside property has been acquired by the City and is officially New York City Park land, plans are underway for its clean up and conversion to open space. The City is still conducting studies to determine the extent of the contamination on the site, but with about 160 years in operation as a petroleum processing facility, that clean up is likely to be substantial.


Williamsburgh Gas Light Co. – the block from North 11th to North 12th, Kent to the river, was historically the home of the Williamsburgh Gas Light Co., a manufactured gas plant that started operations at this property in the 1850s. The eastern part of the property – 50 Kent Avenue – was the location of three large gas storage tanks – gasometers – which are now the subject of a 9-year Superfund clean up operation to the tune of $22 million. This half of the block was acquired by the City in 2011, and for the past few years was used as the venue for the OSA summer concert series. In terms of environmental condition, this half of the block also yields the most information for the surrounding blocks, having been the subject of dozens of studies over the past two-plus decades.

Manufactured gas – coal tar gas – was what lit urban America in the 19th century, before Edison and Tesla brought us electricity and light bulbs. Coal tar and coal tar gas were widely produced in many American cities from the 1850s through the early 1950s. The gas was originally produced by capturing the off-gassing from burned coal, and the process was a very local one – manufactured gas plants were located throughout New York City, usually on the waterfront, where access to large amounts of coal could be readily had.

MGP gas storage tanks are typically the most heavily contaminated part of former MGP sites. The tanks, which were the end point in the coal-tar refinement process, stored the gas before it was delivered via pipes to houses, business and street lamps throughout the area (by the way – a fourth holder was located across Kent Avenue, at what is now the site of an office building). The primary source of contamination in the gasometers was residual coal tar, which would sink to the bottom of the tanks and absorb into the ground. Due to the subsurface construction of the gasometers, which was typically masonry, there was ample opportunity for seepage of the coal tar residue into the soil. Coal-tar plumes can extend directly down many tens of feet, and extend outward from the tank area. Investigations conducted as part of the 50 Kent cleanup operation [PDF] show that “petroleum contamination co-mingled with coal tar contamination” was found as deep as 50′ below ground, and as far away as the sediment in the East River, more than a block to the west. Other reports available through National Grid’s community portal for the clean up indicate that “dense non-aqueous phase liquid (DNAPL) tar impacts” have migrated off site”. The high water table on the waterfront may increase the opportunity for lateral movement of coal tar. Remediation of this portion of the site includes excavation and backfilling with clean fill the tank areas to a depth of 25′ to 30′, and extraction and backfilling with clean fill the remaining area to a depth of 5′.

1887 Sanborn

1887 Sanborn map, showing the Williamsburgh Gas Works Co. site and its

three gasometers. [NYPL]

The western half of the gas works block housed part of the CitiStorage document storage facility. This building burned down in a spectacular conflagration in January 2015 (interestingly, that may not have been the most disastrous fire at Bushwick Inlet Park). The CitStorage portion of the block was also historically part of the Williamsburgh Gas Light Co. operations, housing the coal sheds, the retort house and the purifying house. The retorts – large furnaces – were where coal feedstock was burned and resulting gases were captured for storage and distribution. The purifying house consisted of a series of tanks to capture sulphur and coal residuals from the manufacturing process. The waste from purifying houses was often disposed of onsite, and along with coal tar residue underneath gasometers, this purifying waste is a primary target in MGP clean up operations. While the environmental condition of the eastern half of the gas works block is well known, no public documents are available to show what contamination might exist directly on the western, CitiStorage, portion of the property. Various site investigations over the past 25 years [PDF] have indicated high levels of contamination on all four sides of the CitiStorage property. These include VOCs, SVOCs and other contaminants related to the MGP operations on this block and to “historical petroleum releases from the former distilling and storage operations” on the blocks to the north and the south.

CitiStorage site – the block between North 10th and North 11th Street houses the remaining CitiStorage document storage facility, a full-block metal-clad building. This parcel, and the western half block of the gas works site, are the subject of an ongoing battle by neighborhood activists to force the City to complete the acquisition of the properties for Bushwick Inlet Park. Prior to CitiStorage’s occupancy and going back to the 1940s, the block was part of Brooklyn Eastern District Terminal (BEDT), a freight railway system that served north Williamsburg. Before BEDT, the block was home to the second half of Standard Oil’s Pratt Works. This facility, operated by Pratt as early as 1868, was used to process, store and package kerosene and other petroleum products for distribution. As many as a dozen tanks, ranging in size from 400 barrels to 14,000 barrels (roughly 17,000 to 600,000 gallons) occupied the center portion of the site. Packing and printing facilities were located to the west, and stables and offices to the east. Here too, there are no public documents available to indicate what environmental legacy may exist at the property. But the reports for 50 Kent make it pretty clear that there is contamination immediately adjacent to the property relating to both the petroleum distilling and storage operations on this block and to the MGP operations on the block to the north.

1905 Sanborn tanks

1905 Sanborn map showing Standard Oil’s storage
facilities at the CitiStorage site. [NYPL]

Soccer Field site – The only built portion of Bushwick Inlet Park is the soccer field and community facility/parks headquarters on the block between North 9th and North 10th Streets. This block was part of BEDT for many years, housing hay storage and bulk flour storage and milling operations. Prior to BEDT, the block was home to Palmer’s Dock coal storage facilities. During the Palmer’s Dock era, the block was much shorter; sometime in the early 20th century, the block was doubled in size and extended into the East River. Unlike the blocks to the north, there does not appear to have been any heavy industrial operations or petroleum-related operations at this block. As a result, the clean up required for the construction of the existing park was much less than what is anticipated for sites like Bayside and 50 Kent.

In all, the three blocks from North 10th Street to Bushwick Inlet are home to some of the most worrisome types of polluters when it comes to formerly industrial sites. Oil refining, oil storage and manufactured gas production were all intensive industrial operations that have left well-documented levels of contamination and sites across the country. The active clean up of 50 Kent Street is expected to be an 18-month process, completing in the Summer of 2017. But planning and studies to prepare for the clean up have been ongoing since at least 2006, so the entire process to clean up just this one half block will have taken more than a decade. The clean up of the the Pratt/Bayside property could also take years, as it requires investigation, planning, demolition of existing tank structures, and ultimately cleanup. The clean up of the two CitiStorage sites is the big question mark – the property owner has told community activists on numerous occasions that both sites have been tested and are clean as a whistle, but no tests have been released to the City or to the public, so this remains to be verified. Extensive testing conducted by Metcalfe & Eddy in 2006 as part of the investigation and planning for 50 Kent [PDF] showed high levels of VOCs, SVOCs and coal tar residue at various locations along North 10th and North 11th Street, immediately adjacent to CitiStorage properties. The M&E report attributes these contaminants to releases from the former Standard Oil distillery and storage operations between North 10th and North 11th Street as well as to the MGP site. The same report identified high levels of “petroleum contamination co-mingled with coal tar contamination” in sediment samples collected along the East River between North 10th and North 12th Streets, adjacent to the CitiStorage properties, which was attributed to the Standard Oil and Williamsburgh Gas Light Co.

Based on the many reports and investigations related to 50 Kent Avenue, it is clear that there is contamination related to both the MGP operations and the petroleum processing and storage operations of Standard Oil throughout the three and a half blocks from North 10th Street to Bushwick Inlet. Clean up and conversion of these properties to parkland and usable open space is very achievable, and ultimately, the parkland will be safe and usable, but it is a lengthy process. Clean up related to the gas works operations is subject to a consent decree, by which National Grid – the successor to Williamsburgh Gas Light Co. and Brooklyn Union Gas – is responsible for carrying out and paying for the clean up. But as far as I know, no such decree exists for the former Pratt Works sites of Standard Oil at Bayside and CitiStorage. The lack of such a legacy owner to foot the bill for clean up is believed to be the reason why the 8+ acre property sold for a relatively low sum. Unless the City can successfully litigate to draw in additional legacy polluters such as Exxon/Mobil, the cost of the clean up will be borne by the owner and buyer (the City of New York at Bayside). The City may be able to pursue Standard Oil or National Grid for the clean up costs, but that would presumably require a fair amount of legal fees and time. Would the same be true of CitiStorage’s former Standard Oil property?

BEDTAerial1929

1929 aerial view south towards Brooklyn Eastern District Terminal (BEDT). Oil storage tanks for Standard Oil’s Pratts Works can be seen in foreground.
[Fairchild Aerial Survey photo (1929) courtesy of www.bedt.info]

Riverside Interludes, Far From the Madding Crowd

The Times discovers the magic of Grand Ferry Park:

the fleck of a park that the local residents know as one of the few places amid the soaring condominiums and fenced-off industrial lots of Williamsburg where one can steal time with the water, separated from the concrete by no more than a jumble of boulders.

One of Williamsburgh’s first ferry services to Manhattan was located here as early as 1814 (steam service arrived in 1827), but as the article notes, it has been almost a century since there were any ferry boats stopping here.

And it is not really set in nature, not with the old Domino Sugar Factory on the left and the fenced-in warehouses, whatever they hold, on the right. It is not really quiet, either, not with the drone of nearby machinery pulsing at all times. But it feels quiet.

What they hold (and what is making the noise) is a small gas turbine power plant, constructed by the New York Power Authority in 2001 or so.